Skip to main content Skip to search Skip to main navigation
+49 2151 820200
Mon-Fri 9 am - 6 pm, Sa 9 am - 1 pm
Fast shipping until 1 p.m.

Spektrum SPM1454 Head Temperature Sensor-Long Lead, 1 pce.

Product information "Spektrum SPM1454 Head Temperature Sensor-Long Lead, 1 pce."

Temperature sensor fits Losi 5ive-T.

0 of 0 reviews

Average rating of 0 out of 5 stars

Leave a review!

Share your experiences with other customers.


Skip product gallery

Customers also bought

y0789 Chassis mud flaps for Losi 5ive-T/2.0
y0789 Chassis mud flaps for Losi 5ive-T/2.0

Chassis mud flaps for the Losi 5ive-T, made of 1.0 mm extremely durable plastic material. The mud flaps are precisely contoured to follow the 5ive-Ts roll cage and body shell. Die-cut and ready for installation featuring 15 eyelets in 3 different sizes and 4 each form and hole punchings to fit the roll cage brackets. The set also includes complete hardware for installation and an illustrated manual! Dimensions of mud flaps (laying flat): 930 x 135 mm Set includes: 2 x protective cover (right and left) 6 x cable clip 14 x fixing screws 12 x washers 1 x manual

Regular price: €49.90
Skip product gallery

Customers also viewed

SPM9558 Spektrum Telem Brushless RPM Sensor
SPM9558 Spektrum Telem Brushless RPM Sensor

Genuine Spektrum spare/option part. Only working with a reciever with telemetry function like the "Spektrum SR6000T reciver" or a transmitter with an external telemetry module. Works with all brushless motors for rpm data through SPM telemetry modules and integrated telemetry receivers. Easy installation.Content1 pieces

Regular price: €40.99
y0481 Various Zenoah Label, 1 St.
y0481 Various Zenoah Label, 1 St.
y0481 y0481 Diverse Zenoah Label, 1 St.: y0481/03 G260RC Zenoah Label

Glossy Zenoah stickers.

Regular price: €4.90
104966 HPI Super Heavy Duty Drive Shafts Baja 5SC
104966 HPI Super Heavy Duty Drive Shafts Baja 5SC

Genuine HPI spare/option part. Seriously beef up your Baja drivetrain with the 9mm thick Super Heavy Duty Drive Shaft! This is standard equipment on the Baja 5SC but will easily fit the Baja 5B, Baja 5B 2.0, Baja 5B SS and Baja 5T to dramatically increase the longevity and strength of your buggy or truck's drivetrain.Dimensions: 18 x 116 mm.Contents:2 pieces

Regular price: €49.99
6598 FG Gas/Brake-servo T1005
6598 FG Gas/Brake-servo T1005

Genuine FG spare/option part. Powerfull servo for 2WD and 4WD 1/5 and 1/6 cars. Ballraced, with metal gears.Technical data:Voltage : 6.0-7.4VSpeed : 0.14s-0.12s/60°Torque: 9-10kgcmDimensions : 40.8 x 20.1 x 38 mmWeight : 56 gContents:1 piece

Regular price: €44.50
%
s05502 alloy uprights, rear, for FG models and Carson/Smartech, 1 pair
s05502 alloy uprights, rear, for FG models and Carson/Smartech, 1 pair

Alloy rear uprights, with replaceable hinge pin bushings.Fits FG and Carson/Smartech Attack, Attack Evo, Gas Blaster, Gas Devil, Super Attack, CRT, CRT 4x4, CPT, Uno, Monster Truck, Pick Up, Beetle and C5.The bearing bushings and bearings should be glued in place, as they have minimal play.One each lefthand and righthand version.Please note: for the installation of all popular disc brakes, we recommend: y6479

Sale price: €24.95 Regular price: €79.90 (69% saved)
500405857 Carson Dirt Attack XXL DMAX Body shell, without rear wing
500405857 Carson Dirt Attack XXL DMAX Body shell, without rear wing

Original Carson spare/tuning part. Length 560mm  Width 240mm  Height 160mm  See photos for scope of delivery.1 pieces

Regular price: €79.99
26155 FG Vehicle decals Monster / Stadium / Street Truck, set
26155 FG Vehicle decals Monster / Stadium / Street Truck, set

Decals for Monster / Stadium / Street TruckSheet dimensions:480 x 340 mm240 x 170 mm (2x)

Regular price: €33.00
Loading...
Upload in progress, please be patient ...